Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL

Crossrail Surface Works: Stations West (Phase 1)

Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL

CEEQUAL Excellent (82.4%) – Whole Project Award
Version 4, June 2018 | London, UK

ClientNetwork Rail and Crossrail
DesignerArcadis
ContractorTaylor Woodrow
Assessors: Olose Olubukola (Taylor Woodrow), Sarah Hart (Arcadis), Dan Evans (Taylor Woodrow)

Project Summary

The Crossrail West Stations Project received a CEEQUAL Excellent Whole Team Award due to the commitment of the project to implement sustainability throughout the project. Various social and environmental initiatives with economic benefits were undertaken.

Taylor Woodrow was awarded the design and build contract for the (Crossrail West Stations) project by Network Rail, which includes 13 different sites stretching along the existing Great Western Railway network from Acton Main Line to Maidenhead station. Each of the stations along the line was modified to accommodate the new nine-carriage, 200-metre-long, Elizabeth line trains, which are significantly larger than the existing trains running along the route. The project scope included extending platforms, modifying station canopies, installing footbridges and upgrading power supplies, mechanical and electrical equipment, station information and surveillance systems.

Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL

Project Achievements

The initiatives and innovations implemented at CWS go above and beyond the contractual requirements on the project. Our efforts were recognised by two major awards, the Great Western Rail & Crossrail Sustainability award and Green Apple award. These initiatives were led by the Project Director, three full-time environmental and stakeholder staff – all of whom work with various design, engineering and construction departments to successfully integrate sustainability management into our day-to-day operations.

A vegetable garden, food waste processors and a rain water harvesting system were installed in our Haven Green site office in Ealing Broadway. Noise management initiatives included 24/7 web-based monitoring that has an amber and red alarm system to notify site teams; Section 61 posters and tool box talks tailored to the specific works; and use of plant that reduces noise levels, have been implemented across the project.

We carried out many community initiatives, the more notable activities include projects such as raising awareness of career opportunities in local schools, mentoring school students through a real-world engineering problem, volunteering time to clean-up the Hayes canal.

Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL

Noise Management

Our project affects millions of stakeholders as it stretches across 13 sites in London, South Bucks, Slough and Windsor, with the majority of the works undertaken at night when the trains are running less frequently, therefore effective noise management is critical to the project’s success. The project is required to work within strict Section 61 conditions of consent agreed with the local authority. No enforcement actions or breach of the Section 61 occurred throughout the duration of the project. CWS purchased five semi-permanent noise monitors with a web based noise monitoring system that allows us to self-deliver real-time, 24/7 noise monitoring. This means we can react to noise trigger alerts while the work is being carried out so that the site team can investigate the issue right away rather than a noise consultant providing the data the next day. The daily noise data allows us to produce monthly compliance reports which we send to our closest sensitive receptor at the Ealing Broadway site.

In addition, we make every effort to reduce the noise our operations create by, for example, using silenced equipment where possible (such as the use of super silent generators, hybrid lighting towers, and a Giken Silent Piler when sheet piling); using prefabricated construction elements; erecting acoustic screening; and arranging acceptable working hours or in some cases re-programming works to minimise the impact on the public.

Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL
Use of noise barriers for excavation works
Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL
Attended noise monitoring for canopy beam works on platforms at Slough

Community and Stakeholder Engagement

The project scored 100% in section 12 (Relations with local community and stakeholder) of the CEEQUAL assessment. Community engagement for CWS was a non-contractual requirement, however as a project, we were committed to maximising community engagement opportunities and minimising negative community impacts. A Community Manager role was created by the principal contractor to manage the project’s stakeholder relations activities such as complaints, letter-drops, door-knocking and drop-in centres; and to pro-actively invest in the community with initiatives such as mentoring programmes, school presentations, work placements, fundraising activities, volunteering days. At CWS we not only focussed on leaving the community with an improved railway system but left the area with a lasting commitment to the community which will continue long after Crossrail starts operating. Some of the community initiatives we were involved in over the duration of the project includes:

  • The Engineering Education Scheme – a scheme which involved mentoring six college students through a six-month real-world engineering project. The students won the contribution to business award for the scheme.
  • A three-day Budding Brunnel Workshop run in association with the Construction Youth Trust.
  • Volunteered at the Network Rail and Crossrail stall at the Slough play day event.
  • Volunteered with the Canal & Rivers Trust to clean up the river and embankment at Hayes & Harlington.
  • Volunteered at the Horsenden Hill Farm (Perivale) to help with planting, weeding, sieving and relocating compost and clearing the farm.
  • Presentation at local schools both to secondary and sixth form college students.
  • Attended Notting Hill & Ealing High School’s Career Convention
  • Presentations to 45 civil engineering students on site. Presentations on topics such as Engineering Design, Management and Operation, Health & Safety and Environment as well as careers pathways.
  • Influencing over 900 students from local schools within the community.
  • Springhallow Special School students with 4 Taylor Woodrow Mentors helped plant vegetables at Haven Green compound.
  • Food collection for Ealing food bank
  • Raised approximately £35,000 for local charities and organisations.

Vegetable Garden & Rain Water Harvesting

To enhance biodiversity, five vegetable planters made from plastic drainage pipes and wood pallets which would have been disposed in the recycling waste skips were installed in the Ealing Broadway site compound. Spare and unwanted garden tools were donated by project staff to encourage reuse of materials on the scheme as much as possible. Vegetables, herbs and flowers, such as tomatoes, potatoes, mint, chives, sunflowers, were planted in the garden by children from the Springhallow School (a local special school for pupils aged 4-16 years with a diagnosis of Autism). The children also planted and took home individual sunflower pots. The garden was maintained by a number of staff who had volunteered to regularly water and weed them.

A rain water harvesting system was installed within the office compound and used for watering the gardens. This scheme contributed to improving local community engagement; increasing sustainability awareness both within the project and locally; improving biodiversity through rain water harvesting, reuse of materials, planting vegetables, flowers and herbs.

Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL
Rainwater harvesting system at Haven Green site office
Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL
Vegetable planters made from plastic drainage pipes and wood pallets
Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL
Children from SpringHallow school planting vegetables
Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL
Vegetable planters with thyme, chilli and rosemary

Food Waste Processors

In addition to this, the project purchased three food waste processors called Smart Cara, an innovative way of disposing food waste. Leftover food waste produced in the office is placed in the Smart Cara. The food waste is heated and grinded (to one tenth of its weight) to produce a soil enricher. The low energy food waste processor runs on just approximately 250W of energy per month. The soil enricher produced from Smart Cara was mixed with compost and used for planting the vegetables. This scheme contributed to reducing the number of general waste collection and bin liner cost; and production of a soil enricher; and reducing carbon emissions through onsite food waste treatment and reducing the number of waste collections required.

 

Crossrail Surface Works: Stations West (Phase 1) | CEEQUAL
Food waste processor (Smart Cara) in the Haven Green site office

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Skonviksvagen-featured

Stockholm Metro Nacka project awarded Excellent

The Stockholm Metro Nacka Extension is awarded Excellent, showing Stockholm's commitment to sustainable urban development ...
breeam-infrastructure-stockholm-metro-extension-sofia

Stockholm Metro Sofia access tunnel a BREEAM Infrastructure success

BREEAM Infrastructure is helping Stockholm expand it's Metro to boost public transport and support sustainable urban growth ...
Stockholm Extended Metro access tunnel Sundstabacken achieves CEEQUAL Excellent rating

Stockholm Extended Metro access tunnel Sundstabacken achieves CEEQUAL Excellent rating

The Stockholm Metro extension aims to boost public transport capacity by growing the system. Building metro infrastructure in a dense ...
E08-Forberedende-arbeider-BREEAM Infrastructure

Preparatory works for the new water treatment system in Oslo achieves BREEAM Infrastructure Excellent rating

The preparatory works for the new water treatment system in Oslo, ordered by 2028 achieves BREEAM Infrastructure Excellent ...
Ramsdal bridge BREEAM Infrastructure

E39 Mandal øst – Mandal

E39 Mandal East- Mandal city consist of a 7 km long four lane highway that together with the new E39 ...
BREEAM Infrastructure Bybanen D18 Sykkelvei Kronstadtunnelen

Bybanen D18 Sykkelvei Kronstadtunnelen

Project D18 Sykkelvei Kronstadtunnelen is part of the Bybanen-light rail construction stage 4 development scheme. This is the largest development ...