Version 5, May 2014 | Pok Fu Lam, Hong Kong Island, Hong Kong

Client: Water Supplies Department (WSD), Government of the Hong Kong Special Administrative Region;
Designer: Ove Arup & Partners Hong Kong Ltd.
Contractor: Law Chi Yip Construction Company Ltd.
Assessor: Tammy Tse (Ove Arup & Partners Hong Kong Ltd.)

Project Summary

The Salt Water Supply System for Pok Fu Lam Area is a design and construction supervision assignment commissioned by the Water Supplies Department (WSD) of the Hong Kong Special Administrative Region, for a new salt water supply system serving the Pok Fu Lam area of Hong Kong Island. The project was commissioned in July 2007. Upon completion of the project, the system will supply salt water, instead of fresh water for flushing, to the Pok Fu Lam area every day and is expected to save substantial amount of fresh water a day.

The project comprises:

  • Construction of Telegraph Bay Salt Water Pumping Station and the associated sea water intake culvert at Telegraph Bay seafront area;
  • Construction of Wah Fu Salt Water Service Reservoir near Wah Fu Estate;
  • Construction of Wah Fu Salt Water Pumping Station near Wah Fu Estate;
  • Construction of Pok Fu Lam Salt Water Service Reservoir on the hill behind Pok Fu Lam Village;
  • Laying of the associated salt water mains; and
  • All the associated civil, structural, geotechnical, electrical and mechanical works including site formation, rock excavation, landscaping, permanent and temporary accesses which are necessary for the completion of the works.
Salt Water Supply System for Pok Fu Lam Area | CEEQUAL
Pok Fu Lam Salt Water Service Reservoir PM

Challenges and Achievements

People and Communities

The project’s nature itself is creating wider social benefits by reducing potable water consumption. Public facilities were improved by incorporating part of the open space of the Telegraph Bay site into the adjacent Cyberport Park for amenity purpose.

A number of consultation meetings were held by the client, designer and contractor with different parties during the different phases of the project, including the District Council members and the residents in the district to inform them on the potential impacts of the project.

Potential effects on neighbours were identified by conducting various impact assessments during construction and operational stage including noise pollution, air pollution, water quality, waste, cultural heritage, landscape and visual and ecology. Various measures were incorporated into the construction and operational processes to mitigate effects on neighbours on visual, dust, and noise.

In particular, the use of acoustic roller shutter in the pump hall demonstrated the use of innovative solutions for nuisance mitigation in minimising the noise impact to the nearby area. The selection of external finish of the Telegraph Bay Salt Water Pumping Station allows the pumping station to blend into the adjacent development.

The Historic Environment

Although there are no archaeological remains within the development area, four masonry bridges located at the main access road to the Pok Fu Lam site were identified. Soon after the commencement of the project, these bridges were announced as Declared Monuments and the project was suspended to carry out protection measures to the bridges. Temporary bridge mitigation works were put in place to minimise damage, including adding structural support by steel and also controlling the traffic of heavy vehicle trucks during construction. The protection works to the bridges was performed by professional structural engineers and monitored by a history professional from the statutory organisation.

Salt Water Supply System for Pok Fu Lam Area | CEEQUAL
Telegraph Bay Salt Water Pumping Station PM
Salt Water Supply System for Pok Fu Lam Area | CEEQUAL
Wah Fu Salt Water Pumping Station and Service Reservoir PM

How did CEEQUAL influence your project?

The CEEQUAL assessment has provided an opportunity for us to measure the sustainability of this project and compare it with other projects. We have adopted the lessons learned from this assessment and are investigating on how to improve the sustainability performance of our future projects.

Salt Water Supply System for Pok Fu Lam Area | CEEQUAL
Masonry bridge (1)
Salt Water Supply System for Pok Fu Lam Area | CEEQUAL
Masonry bridge (2)
Salt Water Supply System for Pok Fu Lam Area | CEEQUAL
Masonry bridge (3)
Salt Water Supply System for Pok Fu Lam Area | CEEQUAL
Masonry bridge (4)

CEEQUAL insights and case studies

Browse the latest insights, thinking and case studies from CEEQUAL

 

Skonviksvagen-featured

Stockholm Metro Nacka project awarded Excellent

The Stockholm Metro Nacka Extension is awarded Excellent, showing Stockholm's commitment to sustainable urban development ...
breeam-infrastructure-stockholm-metro-extension-sofia

Stockholm Metro Sofia access tunnel a BREEAM Infrastructure success

BREEAM Infrastructure is helping Stockholm expand it's Metro to boost public transport and support sustainable urban growth ...
Stockholm Extended Metro access tunnel Sundstabacken achieves CEEQUAL Excellent rating

Stockholm Extended Metro access tunnel Sundstabacken achieves CEEQUAL Excellent rating

The Stockholm Metro extension aims to boost public transport capacity by growing the system. Building metro infrastructure in a dense ...
E08-Forberedende-arbeider-BREEAM Infrastructure

Preparatory works for the new water treatment system in Oslo achieves BREEAM Infrastructure Excellent rating

The preparatory works for the new water treatment system in Oslo, ordered by 2028 achieves BREEAM Infrastructure Excellent ...
Ramsdal bridge BREEAM Infrastructure

E39 Mandal øst – Mandal

E39 Mandal East- Mandal city consist of a 7 km long four lane highway that together with the new E39 ...
BREEAM Infrastructure Bybanen D18 Sykkelvei Kronstadtunnelen

Bybanen D18 Sykkelvei Kronstadtunnelen

Project D18 Sykkelvei Kronstadtunnelen is part of the Bybanen-light rail construction stage 4 development scheme. This is the largest development ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how CEEQUAL can support you.