Tullgarnsbron E01 Sustainable Infrastructure BREEAM

Tullgarnsbron E01 Bridge Sustainability Assessment

Tullgarnsbron E01 Sustainable Infrastructure BREEAM

CEEQUAL Excellent (81.4%) – Whole Team Award

Version 5, February 2023 | Sweden

Assessor: Emelie Gyllenbreider & Emma Tooke, Sweco
Jelena Boskovic, Peab
Verifier: Nigel Sagar, Independent Sustainability Advisor
Client: Uppsala Kommun
Contractor: Peab

Project summary

A new bridge is to be built over the Fyris river, as an extension of the Kungsängs esplanade. The Kungsängen district is being converted from industrial area to residential area and the bridge will become an important link between the east and west sides of the Fyris river. The new bridge will relieve the central parts of the city from car traffic, making a positive impact on the municipal climate goals for 2025 and 2030. The project will also aid in the development of the public transportation system in the city.

The project is divided into five (5) contracts, and will include construction of a new bridge, new alignment of the Ulleråker road, converting part of the existing Ulleråker road to a walk and bike path as well as rerouting of pipes and earthworks. This contract (E01) includes pipe rerouting, preparatory work in the existing street structure, as well as new stormwater facilities and reconstruction of stormwater and wastewater systems. The project is located in central Uppsala, along the Kungsängs esplanade and in its extension over the Fyrisån to connect to the Ulleråkers road.

 

Tullgarnsbron E01 BREEAM Infrastructure Sustainable

Metrics

Embodied carbon emissions ~80,000 kgCO2 equivalent ~50% reduction achieved
Operational renewable energy potential 50,000 kWh per year 100% of total energy use
Recycled material 103 tonnes 100% of total material used
Waste diverted from landfill 103 tonnes 100% of total waste

 

Financial benefits

In your view, has CEEQUAL represented value for money?

CEEQUAL has provided a good framework for sustainability, guidance in setting requirements for the design and construction and provided grounds for discussion and dialogue between the involved parties.

Water Environment

The project managed to get 100% of points after scoping.

Thorough handling of the risks of impact on the ground- and surface water during construction included a control plan. The control plan covered, above following the permit, continuous checks of clouding in the river, amounts of water used, handling construction water with sampling and informing all project members in the importance of not impacting the ground and surface water. Strict handling of chemicals, tools and machinery made sure no negative impact on the river came from the project.

In addition to this, three facilities for sustainable storm water management were completed as part of the project. A macadam reservoir in one of the intersections, to delay storm water from the street and regulate flow. Curb wells and sand trap wells along the street were installed, letting water through, and catching larger particles. A new system for disaster protection was built as part of the project, replacing the old existing one. The new one is better designed to handle the amounts of water passing through it into the Fyris river, and includes a system for delaying flow, trapping oil and trapping sludge before releasing water into the river. The new system is also easier to maintain during operation.

Further information

What were the main challenges for the project and how were these overcome?

As a contractor we had to redesign most documentation to comply with the evidence collected for each question.

What were the drivers and perceived benefits for undertaking a CEEQUAL assessment on this project?

Requirement from the client.

How did the use of CEEQUAL influence the outcomes of the project? 

Higher percentage of ECO-friendly products and fuels used.

What elements of this project highlight best practice and innovation?

Use of ECO-friendly products and fuels.

BREEAM Infrastructure (formerly CEEQUAL) Case Studies

Browse the latest case studies from BREEAM Infrastructure. Read more about how  sustainable infrastructure can drive innovation.

 

Skonviksvagen-featured

Stockholm Metro Nacka project awarded Excellent

The Stockholm Metro Nacka Extension is awarded Excellent, showing Stockholm's commitment to sustainable urban development ...
breeam-infrastructure-stockholm-metro-extension-sofia

Stockholm Metro Sofia access tunnel a BREEAM Infrastructure success

BREEAM Infrastructure is helping Stockholm expand it's Metro to boost public transport and support sustainable urban growth ...
Stockholm Extended Metro access tunnel Sundstabacken achieves CEEQUAL Excellent rating

Stockholm Extended Metro access tunnel Sundstabacken achieves CEEQUAL Excellent rating

The Stockholm Metro extension aims to boost public transport capacity by growing the system. Building metro infrastructure in a dense ...
E08-Forberedende-arbeider-BREEAM Infrastructure

Preparatory works for the new water treatment system in Oslo achieves BREEAM Infrastructure Excellent rating

The preparatory works for the new water treatment system in Oslo, ordered by 2028 achieves BREEAM Infrastructure Excellent ...
Ramsdal bridge BREEAM Infrastructure

E39 Mandal øst – Mandal

E39 Mandal East- Mandal city consist of a 7 km long four lane highway that together with the new E39 ...
BREEAM Infrastructure Bybanen D18 Sykkelvei Kronstadtunnelen

Bybanen D18 Sykkelvei Kronstadtunnelen

Project D18 Sykkelvei Kronstadtunnelen is part of the Bybanen-light rail construction stage 4 development scheme. This is the largest development ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how BREEAM Infrastructure can support you in your quest for sustainable infrastructure development.