Diageo’s modern brewery sets high efficiency standards receives BREEAM Outstanding

Based in the historic St James’s Gate Brewery in Dublin 8, Diageo Ireland produces premium alcohol beverages which are enjoyed throughout the world.

BREEAM Outstanding (91%)
Version:
BREEAM 2009 Europe Commercial: Industrial
Architect: RKD Architects
Building Services: Jacobs Engineering
Contractor: John Sisk & Son
Assessor Company: Easler

About the Building

Based in the historic St James’s Gate Brewery in Dublin 8, Diageo Ireland produces premium alcohol beverages which are enjoyed throughout the world. It is at St James’s Gate where Guinness, the world’s most popular stout, has been brewed for more than 250 years.  It is here that Diageo’s newest and most efficient Brewhouse is located. Diageo’s vision is to create a modern brewery to meet the highest standards in terms of technology, efficiency and environmental management.

Brewhouse No. 4 takes the form of a main two-storey block which houses the brewing tanks and vessels, an extensive ground floor process area, together with upper mezzanine areas giving access to the higher sections of the large brewing vessels. This element of the building rises to a height of about 14m to parapet level.

Flanking this main block to the east and west are a series of support functions. On the east side is the raw materials handling area consisting of a canopy and enclosure for a drive through grain truck facility to offload incoming grain into grain silos building which extends to about 25m in height. Also on the east side a block of single storey stores are provided, served by a delivery yard area. On the west side a second canopy is provided to shelter trucks serving the Delivery and Dispatch area. Also on this side are a series of large silver finish tank structures the highest being a series of four Spent Grain Tanks which rise to over 25m. The South (front) of the building takes the form of a high quality double height glazed entrance hall, including a feature staircase and lift.

The north front of the building, facing towards Victoria Quay, consists of the plain gable end of the Brew House building, but enlivened by a glazed gallery extending partway along the north face, to incorporate a ‘Guinness’ sign within the gallery space.

The building is finished in exceptionally high quality materials for an industrial building, consisting of a combination of white stone cladding to the higher elements of the brew house visible from areas external to the brewery. Matt finished dark grey flat metal cladding panels are proposed to the grain tower element, to produce a striking contrast with the rest of the building.

Vision and Future Plans

Diageo’s vision for the St. James’s Gate site will ensure the continuance of long established brewing activities in Dublin 8. This is in accordance with the guiding principles of the Dublin City Development Plan 2011-2017 and the Liberties Local Area Plan which seeks to retain and improve the Guinness Brewery within Dublin city. The proposed development which forms part of Diageo’s vision for the lands to the north of James’s Street have long-term and wide-reaching benefits in economic, social and cultural terms for Dublin city.

Managing sustainability is key to the future success and social responsibility at Diageo. The organisation is dedicated to improving environmental sustainability for its business and brands – from grain to glass. There are a number of in house initiatives that each contributes to Diageo’s corporate goal of maximising sustainability and best practice.

The Brewhouse uses a Combined Heat and Power Plant (CHP) to deliver power and thermal heat to the process and building services systems. The system is unique in that it uses all the electrical power and thermal capacity of the plant on a continuous basis during the process.

The building is fully commissioned, the contracting team used a considerate contractor’s programme on site and a building user guide was developed for the occupants.

Occupied spaces such as offices and control room have been provided with high quality daylight, views and natural ventilation, internal and external lighting has been designed to national best practice and partitioning systems have been designed to minimise noise transfer.

Energy

The Brewhouse energy usage and demand were designed, modelled and adjusted in order to ensure a carbon negative building. This has been best achieved through the promotion of energy use reduction by utilising the process water and innovative hydronics (water as heat transfer medium in heating and cooling). The energy profile has been delivered by the use of the following design features –

  • Installation of energy recovery system in the new brew house which reduces the requirement for steam heating in the brewing process to the building operation, maximises the thermal energy recovered and minimises vapour losses from the brew house and atmosphere
  • Installation of variable speed drives on the majority of process drives
  • Installation of a hybrid refrigeration system aiming to use 0° instead of -4°
  • Improvisation of improved metering throughout the brewing process
  • Optimum building orientation design
  • Solar shading, and the use of high specification fabric achieving U-values significantly better than the current Irish Building Regulations
  • Enhanced Air tightness
  • Automatic lighting controls complete with high efficiency lighting and occupancy sensors throughout the building
  • HVAC systems that mostly condition through mechanical ventilation with selected fan specific power levels which ensures only a small portion of the building is air conditioned
  • HVAC plant has been specified and procured based on low energy usage, fan speeds and high efficiency.
  • A combined heat & power plant (CHP) provides electrical energy for the entire building HVAC and process plant and utilises 100% of the thermal energy for Building services and process heating.

Environmental Features

Cyclist facilities have been provided in the form of bike stands, showers and a drying room. Given the urban location, there is easy access to a number of services (shop, bank) as well as existing transport links such as light railway, buses and commuter rail station. Dedicated car parking spaces are also provided for low and fuel efficient vehicles and carpooling.

There is a considerable water use reduction over baseline with the use of low flow sanitary installations and 180 cu metres of annual rain water collected for harvesting. Pulsed output water meters are provided linked to the BMS, leak detection is also installed.

The project is a zero construction waste to landfill site as part of Diageo project goals and a compactor and baler are provided for the operation of the brew house.

The project is provided with utility glycol from an existing district chiller system for the purpose of mechanical cooling. The existing chillers have an ODP and GWP of 0, therefore there are no refrigerants in the brew house. A flood risk assessment was undertaken and the design is protected against a 1 in 200 year event, having been categorised as medium risk. External lighting is designed to national best practice to reduce light pollution and uplift.

9 out of 10 exemplar credits were achieved in the Innovation section of BREEAM.

The project achieved 100% of available Energy & Management credits

Related links
Diageo Ireland website

BREEAM case studies

Browse the latest case studies from BREEAM

 

Aligning ESG goals: LXP’s collaborative approach to Green Building Standards

Aligning ESG goals: LXP’s collaborative approach to Green Building Standards

Setting new standards in sustainable practices by aligning tenant and landlord ESG goals and focusing on expanding its sustainable efforts ...
Using BREEAM across an asset’s lifecycle: Hermes Business Campus

Using BREEAM across an asset’s lifecycle: Hermes Business Campus

Building on their initial success with a BREEAM New Construction "Excellent" rating in 2013, NGY Properties Investment SRL further strengthens ...
A single story bungalow by a river - part of Vesteda's portfolio

World’s largest real estate certification powered by BREEAM In-Use for Dutch investors Vesteda

27,500 assets assessed in under a year for Dutch real estate investor Vesteda to prove sustainability commitment through third-party verification ...
External facade of the project building at 10 Fenchurch avenue

BNP Paribas Real Estate and Generali Real Estate achieve target of BREEAM In-Use V6 Excellent rating

Optimisation of existing building fabric and intelligent design features deliver a future-proofed asset in London's financial district ...
China Basin – Achieving BREEAM Very Good rating on a waterfront Tech & Life Sciences Campus in San Francisco

China Basin – Achieving BREEAM Very Good rating on a waterfront Tech & Life Sciences Campus in San Francisco

China Basin achieved a “Very Good” rating in both Part 1 Asset Performance and Part 2 Management Performance, the first ...

Get in touch

Contact us now or call us on +443333218811 if you would like to talk to our team about how BREEAM can support you.