Project Summary

Bybanen D13 Haukeland Holdeplass is the very first underground station at the light rail system in Bergen, Norway. The D13 contract is one of several contracts in a larger development scheme called Bybanen building stage 4, which is a new 9 km line to the suburb of Fyllingsdalen.

The station is located 30 meters below ground between the two hospitals Haukeland university hospital and Haraldsplass Diakonale hospital in Bergen.

The work includes:

  • Building the station area.
  • Two shafts and entrance buildings, including architectural furnishing.
  • Underground walkways with lifts and escalators.
  • Improving the surrounding landscape and existing infrastructure.
  • The underground station connects the hospitals, businesses, and residents to the light rail network and will improve the mobility demands and urban growth in the area.

BREEAM Infrastructure Sustainable Bergen Norway Underground Station Staircase

Metrics

Embodied carbon emissions 1,350 tonnes CO2 equivalent 33% reduction achieved
Waste diverted from landfill 2,640 tonnes 68.8% of total waste
BREEAM Infrastructure Sustainable Electric Digger
Electric Digger

Financial Benefits

In your view, has CEEQUAL represented value for money?

By applying Breeam infrastructure during construction all project participants are involved in searching for new operation methods and finding new solutions for resource efficiency and minimizing materials usage. As a result, it has had a financial effect and reduced material cost.

BREEAM Infrastructure Sustainable Bergen Norway Underground Stairwell

 

Achievements

Management

The project incorporated collaborative planning (lean) throughout the duration of the project. It gives everyone the opportunity to gather knowledge and understanding of the main activities and work schedule. Communication between the workforce and project team was an important component to achieve good management. Combined with monthly meetings with the workforce regarding construction progress, safety, environmental, and financial topics has given more awareness and engagement.

Stalkeholders and communities

The contractor in cooperation with the client has had an ongoing community engagement and has established relations with the local community and stakeholders. The contractor has engaged and interacted with the public through several communication channels, such as social media, project website and a dedicated neighbour contact. The project achieved great communication and involved the residents in environmental, social and economic aspects. The dialog between the parties and feedback has been overall positive.

Resources and waste

The project team has during construction considered material use and efficiency within the context of reducing environmental impacts. For example, the majority of the concrete structures are built with low-carbon concrete with emissions <220 kg CO2 equivalents/m3 (low-carbon class A). The carbon emission from concrete production and concrete quality has been of great importance for the client and contractor, due to the extent of exposed concrete is in the public space, high amounts of concrete used in the building, and the client environmental goals within reducing carbon emissions.

In addition, the project has focused on waste management and finding productive solutions to minimising waste, waste handling on site and waste transfer. There have been several measures implemented to ensure best practice. Hence, the project has achieved a waste sorting of 95%.

Transportation and logistics

The contractor has to a large degree used local firms and suppliers with a short driving distance to the site. Thus, the project has had a significant local profile. The transportation has mainly been through the underground tunnel system and has reduced the environmental impacts, especially with regards to traffic congestion on the local road network and to minimise the potential hazard to vulnerable road users. Also, the project team wants to promote sustainable transportation options and has used electric vehicles and electric scooters for transportation of personel on site. The project team has encouraged the workforce to commute more environmentally friendly and established bike amenities at the construction grounds.

Further Information

What were the main challenges for the project and how were these overcome?

The main challenges for the project were the size of the construction site. The site is small, confined, and located in a populated area in Bergen. Also, most of the construction works occurred underground, which created complex logistics. Planning activities ahead of time was crucial to avoid significant impact on the construction operations, environment, and safety. In addition, the project is near hospitals, which has been an important factor for managing traffic and minimise risk to all road users.

BREEAM Infrastructure Sustainable Bergen Norway Underground Station

What were the drivers and perceived benefits for undertaking a BREEAM Infrastructure assessment on this project / contract?

Breeam Infrastructure (formely CEEQUAL) has been a great tool to encourage sustainability development during construction. The contractor, designer and the client have all worked together, to find solutions within optimizing building elements, resource efficiency and taking actions to minimise further impacts on the environment.

The project has specific sustainability targets for the construction phase and has developed a project-level policy to further commit to a responsible construction. Good communication towards residents, reducing CO2 emissions, reuse material, good waste sorting and electric vehicles are some examples of main targets during construction stage.

BREEAM Infrastructure Sustainable Bergen Norway Underground Stairwell Construction

How did the use of BREEAM Infrastructure influence the outcomes of the project / contract? What was done differently because of the BREEAM Infrastructure process?

Both the workforce and the project team were made more aware of the environmental issues and participated in regular site inspections and monthly environmental inspections.

BREEAM Infrastructure Sustainable Tunnel Construction

What elements of this project highlight best practice and innovation?

Examples of best practice and innovation during construction are:

  • Collecting and returning washing water from cleaning concrete trucks. The water is delivered back to supplier and reused in the concrete production.
  • Applying BIM model and scanning to make precut formwork to fit uneven rock surfaces.
  • Monthly reports including environmental issues and monitoring sustainability targets through weekly and monthly site inspection.
  • Digitizing and mobilizing drawings for workforce and improve productivity on site with new technology.

BREEAM-Infrastructure-sustainable-Bergen-underground-station-construction

Quotes

“Breeam has contributed to creating a system of communication with neighbours in a challenging area. There are two hospitals in immediate proximity, heavy traffic and several demanding residents next to the construction site. The contractor has carried out the project in an exemplary manner and has received great feedback from neighbours in terms of sharing information and construction activities.”

Mona Løvås, Project manager, Bybanen Utbygging

“The entire project has had a high focus on sustainability, which has led to changes in the traditional construction methods and new solutions have been brought to light.”

Hans-Magnus Dyrdal, Project manager, Veidekke

BREEAM Infrastructure insights and case studies

Browse the latest insights, thinking and case studies from BREEAM Infrastructure

 

Skonviksvagen-featured

Stockholm Metro Nacka project awarded Excellent

The Stockholm Metro Nacka Extension is awarded Excellent, showing Stockholm's commitment to sustainable urban development ...
breeam-infrastructure-stockholm-metro-extension-sofia

Stockholm Metro Sofia access tunnel a BREEAM Infrastructure success

BREEAM Infrastructure is helping Stockholm expand it's Metro to boost public transport and support sustainable urban growth ...
Stockholm Extended Metro access tunnel Sundstabacken achieves CEEQUAL Excellent rating

Stockholm Extended Metro access tunnel Sundstabacken achieves CEEQUAL Excellent rating

The Stockholm Metro extension aims to boost public transport capacity by growing the system. Building metro infrastructure in a dense ...
E08-Forberedende-arbeider-BREEAM Infrastructure

Preparatory works for the new water treatment system in Oslo achieves BREEAM Infrastructure Excellent rating

The preparatory works for the new water treatment system in Oslo, ordered by 2028 achieves BREEAM Infrastructure Excellent ...
Ramsdal bridge BREEAM Infrastructure

E39 Mandal øst – Mandal

E39 Mandal East- Mandal city consist of a 7 km long four lane highway that together with the new E39 ...
BREEAM Infrastructure Bybanen D18 Sykkelvei Kronstadtunnelen

Bybanen D18 Sykkelvei Kronstadtunnelen

Project D18 Sykkelvei Kronstadtunnelen is part of the Bybanen-light rail construction stage 4 development scheme. This is the largest development ...

Get in touch

Contact us now or call us on +443330147880 if you would like to talk to our team about how BREEAM Infrastructure can support you.